Small and compact, Yeager's main engineering was also a secondary control room for the ship, intended not only to supplement the bridge during battle but also to take full control of the ship in case the bridge was destroyed or disabled.
The main entrance to engineering was located at the back of the room, with four stations flanking it. The warp core was in the center of the room, with its two power transfer conduits going towards the nacelles at the front of the ship. The two side doors lead to small storage areas and Jefferies tube accesses.